Connections queue: what would actually fix it?

The queue to connect to the GB grid stretches into the 2030s, and reform (TMO4+ / ‘first ready, first connected’) is in flight.

For those who’ve been through the process or study it: what is the binding constraint — planning, transmission build, NESO process, or something else — and what evidence would settle it?